Setting Up the Dig Site
Before we started digging at the dig site we had to set up the dig site. To do that on the first day outside our group brought stakes, meter sticks, and a hammer. Then we set up the dig site by using the meter sticks to measure and put a stake every 2 feet. Then our teacher took the hammer and pounded the stakes into the dirt. Then we put string on the stakes so there were a 4 by 4 number of squares on our dig site. That was how our dig site was set up! Also this took two days to do it. Bye!
Peter
Before we started digging at the dig site we had to set up the dig site. To do that on the first day outside our group brought stakes, meter sticks, and a hammer. Then we set up the dig site by using the meter sticks to measure and put a stake every 2 feet. Then our teacher took the hammer and pounded the stakes into the dirt. Then we put string on the stakes so there were a 4 by 4 number of squares on our dig site. That was how our dig site was set up! Also this took two days to do it. Bye!
Peter
No comments:
Post a Comment